PingProperties and BAM sign turn-key agreement for Siemens Mobility offices
27-11-2020
PingProperties has concluded a turn-key agreement with BAM Bouw en Techniek – Southwest Region, for the renovation of and sustainability improvements to the new Siemens Mobility offices on Dutch Tech Campus at Werner von Siemensstraat 5 in Zoetermeer, with a floor area of approx. 6,000 m2.
The renovation will result in a sustainable and future-proof office building with Energy Label A and a state-of-the-art interior climate. Siemens Mobility is currently leasing the building at Werner von Siemensstraat 7. It will move into the new office building in September 2021 following completion of the renovations.
Sustainable office
The work on the building involves a complete renovation of the shell and the installation of brand-new systems and control engineering, equipped with the very latest climate and sustainability technology. The building will have a high-quality entrance and, in close cooperation with Siemens Mobility, will be fitted out to a very high specification. Following the move, the existing building will also undergo a total renovation to make it ready for a new lessee and transform it into a sustainable office building.
Dutch Tech Campus
Dutch Tech Campus is a campus that brings together a wide range of national and international businesses in the field of mobility, ICT and e-health & care at a single, central site. The businesses are all directly or indirectly connected with technology. The campus facilitates the sharing of knowledge and amenities, stimulates interaction and creates links between the businesses and the neighbouring educational institutions of The Hague University of Applied Sciences and MBO Rijnland (with more than 800 IT students). These connections, synergetic effects and like-mindedness generate innovations and new collaborative ventures.
The campus consists of nine buildings, together with three buildings under development. It also has a range of central facilities including a company security service, meeting rooms and conference facilities, as well as the catering facilities at TBrasserie and TRestaurant, the company restaurant of DTC. Businesses can also make use of a wide range of services. www.dutchtechcampus.nl
About BAM Bouw en Techniek
BAM Bouw en Techniek is thoroughly familiar with the world of its clients and the wishes of its users. Integrated thinking and doing is fundamental to the way we work. Professional, and with maximum focus on the world of the users of our buildings. We develop accommodation solutions that are flexible in function, space and use, so that the building and its systems are ready for the changing function and technology of the future. Clients ask us not only to deliver a building or system, but also to take care of the entire process. As part of the Royal BAM Group, we offer a total package, from planning and construction to long-term operation and maintenance: we are a partner for the entire life cycle of a building. www.bambouwentechniek.nl
News
22-04-2024
PingProperties starts energy management pilot for its hotel ibis Styles Amsterdam Airport
PingProperties has started a pilot to optimize the energy consumption of its hotel ibis Styles Amsterdam Airport to achieve Paris Proof by 2040.
15-04-2024
PingProperties signs new lease with Trekpleister for Stadshart Daily Plaza in Zoetermeer
PingProperties has signed a new long-term lease with ‘Trekpleister’ for Stadshart Daily Plaza covered shopping centre in Zoetermeer. The chemist will lease around 250 m² of retail space on the first floor opposite Dirk supermarket. Trekpleister expects to open its doors in festive style in December, at the same time as Dirk.
08-04-2024
Cascade office complex in Groningen is Paris Proof ready
The Cascade complex, situated at a unique location next to Groningen central railway station, is well on the way to becoming fully Paris Proof. Thanks to sustainable investments in cooperation with PingProperties and its tenant, the Central Government Real Estate Agency, actual energy consumption per m2 has been drastically reduced and the complex will be fully Paris Proof well before 2040, making Cascade ready for a sustainable future.